The University of Rochester required protection of its existing floors during its renovation work to its Strong Hospital and outlying administrative buildings. Rather than spend time and money on material and labor replacing plywood or other heavy, single-use, unsuitable temporary protection, the general contractor elected to use ProplexFR® HD1200, a lightweight, Flame-Retardant, reusable temporary protection material. Not only did it cut labor and maintenance by a massive margin, saving a lot of money both for them and the owner, it provided a safer environment for everyone in the hospital, as a large fire risk had been removed.
University of Rochester – Strong Hospital and Administrative Building
Rochester, NY
2019