When looking to build a temporary construction platform that would be exposed to exterior environment for over two years, Skanska knew that traditional methods weren’t going to be enough. The original design consisted of two layers of plywood, but past experience has shown that this would require periodic maintenance, replacement, and disposal cost as the material curled and degraded in the elements.
The Entry Point solution: One layer of Rhino Tile® FR
Not only did the solution provide significant labor savings, it also prevented damage to the roofing membrane from screws, and reduced the cost of rework. Currently one year into use, Rhino Tile FR are still delivering up to expectations.
Moynihan Station
New York, NY
2017